Batter Up
Where is the optimal place to install Base's next battery?
About the project
Problem.
Where is the optimal place to install Base's next battery? All batteries are the same hardware, but their placement, and relationship to existing grid topology, can dramatically impact their value.
A poorly placed battery could overload a grid transformer or might get throttled and miss out on more lucrative energy markets.
Solution
Batter Up is a physics-based grid simulator that uses real ERCOT data to calculate the performance of a Base-like network of batteries. It is both a test harness for battery deployment algorithms and a model for predicting the optimal location to place a battery while balancing grid safety and profit.
Our system allows users to customize the simulation with peak or quiet usage, failure conditions, and battery network behavior. As the simulation runs, users can monitor what happens over the course of a day. Our visualizations show the grid topology, the status of every battery and transformer, and all of the system's electrical data. At the conclusion of the run, we present a war room dashboard that provides the information utility operators need to understand the state of the system.
Finally, the system presents its measurements for the relative effectiveness of different battery deployment strategies, which transformers need upgrading, and where new batteries are most profitable.
Who It helps
Base's fleet operators and install planners.
Impact
Base's fleet operators can use Batter Up as a test harness to prototype new battery parameters and usage algorithms.
Base's install planners would benefit from the recommendations of where to place new batteries and where to work with grid operators to upgrade the grid.
